Product Packaging
01. Remove the top exhaust fan and maintenance cover plate, pack and fix them to the ground
02. Install cushioning foam pads on the edges of the glass
03. Protective film/tape fixation for mirror and ceramic parts
04. Cover the top with moisture-proof film to wrap the product
05. Wooden corner protectors are installed on the outer side of the product Key reinforcement of stress points such as frame columns and door frames
06. Wrap the bathroom around with dust-proof and moisture-proof film Key package includes door seams, pipeline interfaces, and other parts
Container Shipping
01-Product Packaging
02-Move to Shipping Area with Hand Pallet Truck
03- Switch to Electric Forklift for Lifting into Container
O4-Move Inside Container Using Hand Pallet Truck
05- Close Container After Loading
06- Labeling and Shipping
Installation Guidance
01- Load the bathroom unit into the hoisting basket with pallet jack
02-Hoist to the designated floor
03-Use a pallet jack to pull the bathroom unit indoors
04- Apply structural adhesive to the installation location
O5-Remove the wooden blocks and lower the unit into place
06-Plumbing and Electrical Hook-up