SERVICE

Product Packaging

Installation

01. Remove the top exhaust fan and maintenance cover plate, pack and fix them to the ground

Installation

02. Install cushioning foam pads on the edges of the glass

Installation

03. Protective film/tape fixation for mirror and ceramic parts

Installation

04. Cover the top with moisture-proof film to wrap the product

Installation

05. Wooden corner protectors are installed on the outer side of the product Key reinforcement of stress points such as frame columns and door frames

Installation

06. Wrap the bathroom around with dust-proof and moisture-proof film Key package includes door seams, pipeline interfaces, and other parts

Container Shipping

Installation

01-Product Packaging

Installation

02-Move to Shipping Area with Hand Pallet Truck

Installation

03- Switch to Electric Forklift for Lifting into Container

Installation

O4-Move Inside Container Using Hand Pallet Truck

Installation

05- Close Container After Loading

Installation

06- Labeling and Shipping

Installation Guidance

Installation

01- Load the bathroom unit into the hoisting basket with pallet jack

Installation

02-Hoist to the designated floor

Installation

03-Use a pallet jack to pull the bathroom unit indoors

Installation

04- Apply structural adhesive to the installation location

Installation

O5-Remove the wooden blocks and lower the unit into place

Installation

06-Plumbing and Electrical Hook-up